BANC3, Inc.

Go to...

Civil Engineering

Surveying

Environmental

Construction Management

Information Technology

Specialty Services

Portfolio - Civil Engineering Projects

East Side Access - MTA

Client: Parsons Brinckerhoff/STV
The East Side Access project will connect the Long Island Rail Road's (LIRR) main and Port Washington lines in Queens to a new LIRR terminal beneath Grand Central Terminal in Manhattan. As part of the project, new tunnels will be constructed from the LIRR Mainline tracks in Queens, under Amtrak's Sunnyside Yard and LIRR's Existing Rail Yard, connecting to the existing 63rd Street Tunnel just beyond Northern Blvd. In Manhattan, new tunnels will be bored from the existing bellmouth structure at Second Avenue and 63rd Street, west and then south, under Park Avenue and Metro-North Railroad's four-track right of way. At Grand Central Terminal, a new passenger concourse will be constructed in space currently occupied by Metro-North's Madison Avenue Yard. Eight tracks and four wide platforms will be constructed, along with mezzanines and concourses, beneath Park Avenue at an elevation below GCT's existing lower level. Scheduled for completion in 2013, the project has a budget of $6.3 billion dollars.

BANC3 has been providing engineering design and CAD drafting staff augmentation services for positions such as engineers, designers, CAD draftsman, and other disciplines per the project requirements.